Energy
WWW Version
"Domestic use only" permit, natural gas drilling, requirements for -
SB 164
Cinergy Gallagher Plant, resolution urging reduction of pollution at -
HR 173
Cinergy/ULH&P
acquisition of 1105 megawatts of electric generation facilities, House support of -
HR 109
acquisition of electric generation facilities, support for -
SR 81
Coal mines, electrical mine safety, requirements for -
SB 37
;
HB 8
;
HB 8
: HCS
Coalbed
methane development, drilling permits, requirements for -
SB 263
;
HB 556
methane development, requirements for -
HB 577
methane production, requirements for -
HB 577
: HCS(1),(2)
methane, public protections, requirements for -
HB 577
: SCS
Electric
suppliers, net metering of electricity to customers with photovoltaic generating capacity -
SB 247
transmission siting, location of -
HCR 106
Electrical facilities owned by retail electric suppliers or cooperatives, exclude from Act -
SB 37
: SCA(1)
Mark Goss, confirm appointment as commissioner to PSC -
SR 184
Mine
Safety Review Commission, confirmation, Bayard Collier -
HCR 15
safety, electricity in mines, requirements for -
SB 37
: SFA(2)
Mines, electrical mine safety, requirements for -
SB 37
: SFA(1)
Motor Fuel, subsidized pricing, study of -
HB 296
: HCS
Municipal utilities, electric cooperatives, electricity sales to -
SB 118
Net metering, retail electric service, provision for -
HB 490
Private
utilities, authorize Transportation Cabinet to reimburse for cost of relocating facilities -
HB 447
utilities, permit reimbursement for moving facilities in conjunction with a highway project -
HB 447
: HCS
Public utilities, installations in coal mines, exemptions for -
SB 37
: SFA(3)
Transmission
lines, delete reference to meeting reliability without adding lines -
HCR 106
: HCS
lines, locating in cemeteries, prohibition of -
SB 246
: HFA(1)
siting, public hearings, requirement for -
SB 246
: HFA(3)
Williams, Ellen, confirm appointment as commissioner to PSC -
SR 243
Legislature Home Page
|
Record Front Page