HJR85
WWW Version
The hyperlink to a bill draft that precedes a summary contains the most recent version (Introduced/GA/Enacted) of the bill. If the session has ended, the hyperlink contains the latest version of the bill at the time of sine die adjournment. Note that the summary pertains to the bill as introduced, which is often different from the most recent version.
HJR 85 (BR 1035) - T. Couch
Direct the Transportation Cabinet and the Economic Development Cabinet to conduct feasibility studies on the economic impact and costs of widening the Hal Rogers Parkway into four lanes from Interstate 75 to Perry County; require results to be reported to the Interim Joint Committees on Transportation and Economic Development and Tourism by October 31, 2018.
Jan 17, 2018 - introduced in House
Jan 19, 2018 - to Transportation (H)