Title 405 | Chapter 018 | Regulation 020


405 KAR 18:020.Contemporaneous reclamation.

Section 1.

Contemporaneous Reclamation. Reclamation operations, including, but not limited to, backfilling, grading, soil preparation and revegetation, of all areas affected by surface operations of underground mining shall occur as contemporaneously as practicable with surface operations.

HISTORY: (8 Ky.R. 1558; eff. 1-6-1983; Crt eff. 7-3-2018.)

7-Year Expiration: 7/3/2025

Last Updated: 12/15/2021


Page Generated: 9/19/2024, 12:15:11 PM